Complete AV Fitout for Period Property

Bayswater, June 2019

Design and installation of a basic data and RF network for a six floor period property. The design was interesting as the owners wanted the system set up so that the bottom two floors could be separated to use as a rental property if required.

  • Middle Atlantic rack
  • Unifi Ubiquiti Wifi Access Points
  • Global SkyQ 2-way Adapater
%d bloggers like this: